Bridge project, Part 1

DSCF7138

The redevelopment project on the south side of Lake Natoma Crossing was finished a little over a year ago; it created an ADA (Americans with Disabilities) accessible path along the water and rerouted part of the bike trail. The construction work went on for nearly 2 years, and during that time I often stopped on the bridge to check the progress and periodically take pictures. Below are the progress photos I took of one portion of the work, the stairway connection between two levels of the trails (shown in pink below).

DSCF7130

Partial map of the project area

DSCF5047

Concrete forms in place, November 2016

DSCF5919

Concrete stairway, December 2016

DSCF6650

Stairway finished, March 2017